Roll and efficiency gain calculators

​​​Use our calculators to find out the specific roll diameters and material lengths that meet your machine specifications, or to help identify areas of potential efficiency gain such as savings per hour/week/year by using a thinner caliper material.

Click the appropriate tab, enter in the necessary data and click "CALCULATE" to see results in the gray field(s) below.  ​* These calculators are for estimation purposes only​.​​​​​​​​

Language:Idioma:Idioma:
Select units:Seleccione unidades:Selecionar unidades:
Core diameter:Diámetro del núcleo:Diâmetro do tubete:
Material thickness (milsmicrons):Espesor del material (milsmicrones):Espessura do material (milsmícrons):
Roll length (feetmeters):Longitud del rollo (piespies):Comprimento da bobina (pésmetros):
Estimated roll diameter (inchesmillimeters): Diámetro estimado del rollo (pulgadasmilímetros): Diâmetro estimado da bobina (polegadasmilímetros):
Select units:Seleccione unidades:Selecionar unidades:
Core diameter:Diámetro del núcleo:Diâmetro do tubete:
Roll outside diameter (inchesmillimeters):Diámetro rollo exterior (pulgadasmm):Diâmetro externo da bobina (polegadasmm):
Material thickness (milsmicrons):Espesor del material (milsmicrones):Espessura do material (milsmícrons):
Estimated roll length (feetmeters): Longitud estimada del rollo (piesmetros): Comprimento estimado da bobina (pésmetros):
Select units:Seleccione unidades:Selecionar unidades:
Total caliper existing (milsmicrons):Gramaje total actual (milsmicrones)Espessura total - Atual (milsmícrons)
Total caliper new (milsmicrons):Gramaje total nuevo (milsmícrons)Espessura total - Nova (milsmícrons)
Downtime cost ($/hr):Costos por tiempos de parada ($/hr):Custo Parada de máquina ($/h):
Downtime for roll changes (hours/week):Tiempo de parada por cambios de rollo (horas/semana):Parada de máquina para troca de bobinas (horas/semana):
Downtime cost/week due to roll changes ($): Costos semanales debido a los tiempos de parada por cambio de rollo ($): Custo parada máquina/semana devido a trocas de bobinas
Weekly savings: Ahorro semana: Economia semana:
Annual savings: Ahorro anual: Economia anual:

​​​​​​​​​​​​​​​​​​​

 

Want improved productivity?​

Total Overall Cost (TOC) of applying a label can be improved significantly when utilizing UPM Raflatac's 2nd generation materials that are of thinner caliper.  Reducing the overall thickness of the label stock by downgauging the liner, face stock or both can result in possible gains in efficiency throughout the supply chain.​ ​

Contact our Technical Product Consulting team​ » 

Utilize our tool to help identify areas of potential efficiency gain and engage our resources to assist in identifying the possibilities of improvements to sustainability and cost reduction impact.

      ​